Project description
The Pouponnière du Calvados is a structure which takes in some sixty children from 0 to 6 years of age in great distress each year. This complex project, designed with curved lines that provide a sense of security, owes its success to the synergy and anticipated organisation of the participants: the file was studied with the company over a period of 2 years, all the trades worked together within a very short timeframe of 7 months, and the logistical aspects were intelligently managed (anticipation of orders 2 months in advance, storage, etc.).
A range of technical solutions were deployed. Examples of this are :
- Curved structures in Placoplatre® BA 6 forming islands,
- Plaster and staff elements, all in the round,
- Decorative ceilings in Rigitone® Activ’Air® 8-15-20 Super,
- The construction of Placostil® 98/48 partition walls in Placo® Duo’Tech® 25.
The highlight of the project was the creation of the dome, the central point of the building, forming a six-petal flower. This required the bending of Stil® F 530 furring using a specially designed machine. The wooden arch, which was used as a template to connect the staff panels, was specially created in a workshop.
This site has high heat, fire, mechanical and acoustic performance: thermal resistance R=10, independent airtightness, fire resistance EI 60 and R 30, sound insulation of 67 dB in the separating section/47 dB in the distributing section and an acoustic correction of 0.50.
Main information
2 200 m²
Public and
social buildings
Calvados
Department
Paul
Le Quernec
Contractor
Company name: Orquin
Main Representative: Mr. Julien BOUHANA & Mr. Alexandre NEVEU
Number of collaborators: 28
Specialties: Drywall, Insulation, Demountable – non-demountable ceiling, Interior and exterior woodwork, Cladding, Customized fittings
Founded in: 1952
Biography: Orquin is a company specialising in interior fittings such as plasterboard, drywall, wooden ceilings and suspended ceilings. The company has its own workshop.
Contractors: Julien BOUHANA & Alexandre NEVEU
Key Challenges
-
Good relationship/cooperation within all the partners of the project (during Covid-19 crisis)
-
Use of a wooden arch, traditional technic for the curved dome (inspiration of a Ken Follett novel)
-
Innovative solution in order to respect the architect demands and to facilitate the work of the craftmen
-
Performances: Mechanical – Fire – Acoustic – Air quality – Thermal (justification with letter, PV, acoustic report, rule of art, technic assistance).
-
The place has a very high aesthetic quality and will be well appreciated to children
Key Achievements
-
Budget : 700 000 €
-
Time : 7 months (anticipation of orders before and special storage of goods to prevent robbery)
-
Technical challenges : building with many curves and round shapes