Cultural Centre Milovice
Project description
The renovation of the Milovice cultural centre not only added its unique ceiling design in the main hall but also honored the building’s historical significance as a cultural landmark. Prior to the renovation, the center held a key role in community life, and now, it stands as a modernized venue ready for the future. Updates included improved acoustics, comprehensive insulation, window and door replacements, roof repairs, and a modern ventilation system. These upgrades ensure the building continues to serve as a vital space for cultural and social events.
Main information
1 760 m²
Cultural
Centre
Milovice
Ing. arch.
Martin Pálka
Contractors
Vítězslav Kopecký

Company name: Vítězslav Kopecký
Main Representative: Vítězslav Kopecký
Other Representative: Filip Kopecký
Number of collaborators: 20
Specialties: Installation of drywall partitions, tile ceilings and front walls, Acoustic solutions, Fire-resistant drywall construction
Founded in: 1995
Biography: Self-made entrepreneur with over 30 years of experience, specializing in drywall constructions with a focus on acoustic solutions. Kopecký is known for delivering precisely done projects, featuring thoughtfully designed and expertly executed details. Notable works include the Kozlovna restaurant in Kutná Hora, the Goja Music Hall, or the Hospital in Čáslav. As a long-time loyal customer of the Rigips brand he holds certification for our system, ensuring the highest standards of quality.
Website: www.vikostavby.cz
Key Challenges
- Historically preserved building
- Some parts of the building (like the mosaic made by Radomír Kolář in 1981) are historically preserved, so the project had to incorporate them and build around them.
- Covid
- During the pandemic, construction teams faced significant challenges, including compliance with government mandates such as isolation protocols, mask requirements, social distancing, site closures, and rising material costs caused by factory shutdowns.
- Unplanned renovation of the roof
- Large scale high ceilings
- The construction required extensive work from large-scale scaffolding positioned high above the ground.
Key Achievements
- Large scale ceiling
- As a unique project in the Czech Republic, the ceiling of the main theatrical hall, designed by the architect, required meticulous planning. A scaled model was constructed to accurately determine proportions and ensure seamless execution during installation at significant heights, minimizing the risk of unforeseen challenges.
- From a hardly used space into the beating heart of the town’s culture, holding great importance for locals
Sustainability in the project
- Energy efficient building
- Grants supported the installation of new cladding and insulation, roof renovations, and the replacement of windows and doors to maintain a comfortable indoor climate. Additionally, a modern ventilation system was installed as part of the funding initiative.
- Acoustic comfort
- State-of-the-art acoustic solutions have been implemented to enhance the auditory experience for all visitors.
- The entire building is fully wheelchair accessible, ensuring a barrier-free environment for all visitors.
Saint-Gobain products & systems


