School group « Au pied des champs »
Project description
This intercommunal project combines three buildings into one, with spaces separated by different wall and floor colors. It includes a preschool with 4 classrooms, an elementary school with 7 classrooms, an after-school care service, and 3 common rooms. The project is perfectly integrated into the surrounding nature and meets the requirements of an E+C- (Energy and Carbon) certification, focusing on energy performance, air quality, acoustic comfort, and luminosity. A wide range of Placo® solutions was selected and implemented to meet the specific needs of the project. The company carried out a detailed interpretation of the plans to ensure compliance with the building’s complex shapes.
Main information

2 400 m²
School
Community of
Municipalities of
the Zorn Region
ARA-TRIO
Architectes
Contractors
ISOSAN Plâtrerie

Company name: ISOSAN Plâtrerie
Main Representative: Hasan YILDIRIM
Other Representative: Erika FELLNER
Number of collaborators: 50
Specialties: Plastering, Insulation, Ceilings
Founded in: 2009
Biography: The company SARL ISOSAN PLATRERIE, located in Strasbourg in the Bas-Rhin department, serves both individuals and professionals. Whether for renovation, rehabilitation, or construction, it offers tailored solutions to meet the desires and budgets of its clients.
Website: www.isosan.fr
Key Challenges
- Time : 8 months before the school re-entry
- Budget : 350 000€ (plastering works) / 7,8 M€
- Main technical challenges
- High requirements : fire safety, acoustics, thermal performance, and structural durability
- High level of finish required
- Creativity and expertise of the craftsmen
- Exceptional finishes around the skylights
- Interpretation of complex plans (sections, altimetry)
- Suggested improvements
- Quality of ceiling installation with integrated lighting fixtures
Key Achievements
- Collaboration with Placo®
- Prescription work with the economist
- Preparation of the document presenting the company’s technical responses to the specifications
- Optimization of the project cost estimation
- Cooperation between project stakeholders
- Good planning between the project owner, the project manager, and the company’s plasterers
- Efficient multidisciplinary meetings
- Unanimous satisfaction of the project stakeholders
Sustainability in the project

- E+C- building perfectly integrated into nature
- Construction method : facade with a wooden frame, concrete building structure, green roof
- Air quality, acoustic comfort, luminosity, bio-sourced
- Pre-cut plasterboard partitions to avoid waste on-site, save time, and reduce handling for the plasterers