RAW Halle 20

GermanyGermanyCompany Name: KAEFER Construction GmbH

Project description

The team of KAEFER Construction GmbH revitalised the former factory building of the German state railway which was originally built between 1870 and 1890. Close-by is one of Berlin’s largest inner-city development areas called “Mediaspree” and therefore the new concept for RAW consisted of 40 multifunctional rooms for various purposes such as film, music and sound productions which can be rented by the hour. In close cooperation, KAEFER, Rigips and an acoustic engineer designed a completely unique drywall system was with 4 layers of Rigdiur® H gypsum fibreboards in combination with a steel sheet. The sound measurements taken by the acoustic engineer confirm an extraordinary sound insulation of 98 dB, creating almost absolute silence without disturbing sounds from adjoining rooms. Besides the top performance, this unique system offered many installation advantages for KAEFER which lead to major cost and time savings. Furthermore KAEFER has meanwhile received many enquiries for similar projects with this special Rigidur® sound insulation system.

Contractor

KAEFER Construction GmbH

KAEFER is a global company with 28 000 employees at 2 000 locations. They enjoy an excellent reputation with their customers and have grown steadily as a niche insulation supplier since their founding in 1918. The project was executed by Marcel Segebarth and Mario Heß who is working in of the branch in Dahlewitz (near Berlin).

Benefits
Acoustic insulation
Realisation of 40 rooms for various film, music and sound productions with a noise reduction level of 98 dB!!!!
Acoustic control
For simultaneous use of several rooms without disturbing each other.
Superior aesthetic and design
According to the final use of the rooms with or without additional softwood panels the surface was realized in Q4.

Key Achievements

  • Development of an innovative and competitive new system with an extraordinary sound insulation level of 98 dB (measured in the studios)
  • Close cooperation with the sound engineering office and the Rigips product manager
  • Perfect craftsmanship
  • Major cost savings generated with the new system in comparison to the one initially chosen by the architect with competitor’s products
  • KAEFER has already received many enquiries for this unique system

Key Challenges

To develop a unique and more economic system for the studio walls and gain the tender against a competitor by using Rigidur® gypsum fibre board. Very short net construction time for the 40 studios of only 4 months.

Stakeholders

Building owner:
Revaler Straße Property Zwei GmbH
Architect:
Zoom Architekten
Main contractor:
KAEFER Construction GmbH
Photographer:
Patrick Pleul
Saint-Gobain Team:
Michael Paeltz