Lisbon 2018 | Non-residential

Kalamper Hotel

MontenegroMontenegroCompany Name: Monte 5

Project description

Kalamper Hotel is a four-star hotel located in Bar, town in south-eastern part of Montenegro. The building owner’ attention was entirely focused on the highest possible quality and best possible result to meet the extraordinary demands of his guests. Therefore Mr. Kalamperovic worked in close cooperation with Rigips Team to find the perfect products and solutions for each area. As for the wet areas, like SPA – systems with Glasroc® H moisture resistant boards were the perfect solution. Regarding other hotel areas, very specific architectural and interior design ideas by interior designer Vladimir Gugl could only have been completed with perfectly installed drywall constructions and the highest level of craftsmanship.

Contractor

Monte 5

Working for years in drylining Petar established his own company Monte 5 in 2011. He successfully continue implementing drywall systems on many projects in Montenegro.

Benefits
Acoustic insulation
Working for years in drylining Petar established his own company Monte 5 in 2011. He successfully continue implementing drywall systems on many projects in Montenegro.
Superior aesthetic and design
Very specific architectural and interior design ideas were achieved with Rigips regular boards.
Moisture resistance
Systems with Glasroc H and C3 studs were successfully implemented in SPA area.
Exterior application
External ceiling in front of the hotel entrance is done with Glasroc X boards.

Key Achievements

  • Referent building for moisture and mould resistant systems.
  • Harmony of preliminary design with applied materials.
  • Established good relationship with investor.
  • Achieved the required performance criteria whilst achieving a high level of aesthetic detail.
  • All partitions were completed according to high sound insulation standards for luxury hotel.

Key Challenges

Very specific architectural and interior design ideas were completed with perfectly installed drywall constructions achieving required performance at the same time.

Stakeholders

Building owner:
Kalamper
Architect:
Archi Studio
Main contractor:
Monte 5
Photographer:
Sergej Zabijako
Saint-Gobain Team:
Vidan Mitrović, Vladan Ilić