Lisbon 2018 | Non-residential

King's Casino Rozvadov

Czech RepublicCzech RepublicCompany Name: Inter Gips, s.r.o.

Project description

King´s Casino is a Green-field Project located in a small village near the German border. With its aim of attracting wealthy customers, namely from Germany, only high level design solutions and exceptional installation skill were used. The centre piece of the project is a spectacular gaming hall with multilevel shaped suspended ceilings combined with several types of indirect lighting.

Contractor

Inter Gips, s.r.o.

Company was established in 1994 as a drywall systems installers. Firm was separated from one of the largest building companies IPS, a.s. in the Czech Republic.

Benefits
Excellent aesthetics
The major architect´s focus was the final overwhelming impression to the customer entering the great gaming hall.

Key Achievements

  • Multilevel ceilings with different shapes and curves Specific architecture for specific entertainment

Key Challenges

The installer was faced with a number of very specific and difficult tasks. Namely the combination of a complexity of the design and a tight schedule squeezed into just six months was a real challenge. Technically demanding was the need to suspend several heavy crystal chandeliers. This was the reason why newly developed special boards Habito® were used here.

Stakeholders

Building owner:
Vestar Group, a.s. Rozvadov
Architect:
ARCHINA Design s.r.o. – Ivo Nahálka
Main contractor:
Inter Gips, s.r.o. – Petr Pume
Photographer:
Jan Kroupa