Business and Institutional

Piraeus tower - city's landmark

Greece GreeceContractors: I-Project Ltd.

Project description

This architectural landmark is considered the starting point of the new Athenian Riviera and is located in the heart of one of Europe’s largest passenger ports. The Piraeus Tower has 22 floors and total 88m height and it is the first “Green” & Digital high-rise building in Greece. In 1968, a decree issued by the ‘Collonel’ Dictatorship, increased the maximum building height to 24 floors. Within this framework, the construction of the Piraeus Towerstarted in 1972, to house the Maritime Trade Center. The building’s skeleton was completed in 1974, but only the first 3 floors were utilized. For many decades remained unfinished and eventually abandoned – a “sleeping giant,” as locals called it.

Main information

Sustainability certification goal
Building size

34 623 m²

Building purpose / type

Business and
Shopping Center

Building owner name

Piraeus Tower S.A.

Architect name

PILA Architects

I-Project Ltd.

Company name: I-Project Ltd.

Main Representative: Adamopoulos Sotirios

Other Representative: Sainidis Kostas

Number of collaborators: 26

Specialties: Market of new buildings (professional/ residential) – renovation, Dry Lining solutions, Internal decoration

Founded in: 2010

Biography: Mission: Create highly performing constructions, recognized for the integration of innovative and sustainable drylining solutions, their creative and artistic character, that obtain a high degree of customer satisfaction leading to establish strong, coherent, and long-lasting relationship and collaboration

Website: i-project.gr

  • ‘Game changer’ – SG Hellas was qualified to as the suppliers of the DW solutions, decision made upon proposition new Duragyp Active Air ECO plasterboard with 23% recycling conent in yellow paper and the offer of the Recycling service for plasterboards from the demolition of the old building
  • Second sub-contractor to project to keep deadlines and use Rigips Products & Solutions (in different floors than the first one)
  • All Rigips materials were supported with ‘Green’ Certificates (EPD-VOC-HPD-IAQ etc.)

Saint-Gobain products & systems

Benefits
Fire protection
Fire protection
Duragyp Active Air 13 ECO (Fire, Humid, Impact resistant Pb with Active Air and high % of Recycled Material)
Impact resistant
Impact resistant
Duragyp Active Air 13 ECO (Fire, Humid, Impact resistant Pb with Active Air and high % of Recycled Material)
Indoor air quality
Indoor air quality
Duragyp Active Air 13 ECO (Fire, Humid, Impact resistant Pb with Active Air and high % of Recycled Material)
3 in 1 product
3 in 1 product
Duragyp Active Air 13 ECO (Fire, Humid, Impact resistant Pb with Active Air and high % of Recycled Material)
Weight
Weight
Duragyp Active Air 13 ECO (Fire, Humid, Impact resistant Pb with Active Air and high % of Recycled Material)
Moisture resistance
Moisture resistance
Duragyp Active Air 13 ECO (Fire, Humid, Impact resistant Pb with Active Air and high % of Recycled Material)
Fire protection
Fire protection
Fireline 13mm (enhanced with Vermiculite fire resistant plasterboard)
Term cost
Term cost
Fireline 13mm (enhanced with Vermiculite fire resistant plasterboard)
Smooth manual finish
Smooth manual finish
Rigips Joint-fillers
Fixing strength 2
Fixing strength
Rigips Joint-fillers
Interior Walls
Interior Walls
Isover Mineral wool
Fire protection
Fire protection
Isover Mineral wool
Acoustic insulation
Acoustic insulation
Isover Mineral wool
Architect’s testimonial
PILA Architects
A shading structure overhangs& encloses the tower with a dynamic pattern appears different from various locations, creating a rich visual experience that is constantly transforming
Contractor’s testimonial
Manos Giannakopoulos
Be part of this emblematic construction, launch for the first time our new recycled content boards, obtaining the market recognition for our strong focus to sustainable and innovative solutions

Saint-Gobain Team

Manos Giannakopoulos

Photographer’s name

Magdalini Tasoula